DESIGN AND BUILD OF BUCURESTI - BRASOV HIGHWAY, SECTION BUCURESTI - PLOIESTI, KM 31+778 - 46+500
Working equipment
Banks
Median filler
Plants
Quarters
Re-establishments
Passage loading ledge
Culverts
Ialomita works
Laboratory
Drill
Tipper-trucks
Laying concrete stabilised-grader
Laying concrete stabilised-asphalt paver
Asphalt loading ledges
Asphalt at km 32
Bridges
Bridge flooring
September-october asphalting